comp.lang.ada
 help / color / mirror / Atom feed
* Preemptive Scheduling & DO-178
@ 1994-09-12 20:45 Steve Vestal
  0 siblings, 0 replies; only message in thread
From: Steve Vestal @ 1994-09-12 20:45 UTC (permalink / raw)


I am interested in the use of preemptive fixed priority (a.k.a. rate
monotonic) scheduling in avionics systems that have been certified per
RTCA/DO-178, particularly to high levels of certification (flight-critical per
178A, categories B or A per 178B).  If anyone can identify or has experience
with a preemptively scheduled system that has been (designed to be) certified
to these levels, or knows of any FAA or JAA policies regardling preemptive
scheduling, I would be most appreciate of hearing about it.

Steve Vestal
Mail: Honeywell Technology Center, 3660 Technology Drive, Minneapolis MN 55418 
Phone: (612) 951-7049       Fax: 7438       Internet: vestal@src.honeywell.com



^ permalink raw reply	[flat|nested] only message in thread

only message in thread, other threads:[~1994-09-12 20:45 UTC | newest]

Thread overview: (only message) (download: mbox.gz / follow: Atom feed)
-- links below jump to the message on this page --
1994-09-12 20:45 Preemptive Scheduling & DO-178 Steve Vestal

This is a public inbox, see mirroring instructions
for how to clone and mirror all data and code used for this inbox